MATLAB DISTRIBUTED COMPUTING SERVER 4 - SYSTEM ADMINISTRATORS GUIDE Manuel d'utilisateur Page 114

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 148
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 113
4 Admin C enter
When the tests are complete, the Running Tests dialog box automatically
closes, and Admin C enter displays the test results in the Connectivity Te sting
dialog box.
The possible test result symbols are described in the following table.
Test Result
Description
Test passed.
Test passed, extra information is available.
Test passed, but generated a warning.
Test failed.
Test was skipped, possibly because prerequisite tests did
not pass.
4-12
Vue de la page 113
1 2 ... 109 110 111 112 113 114 115 116 117 118 119 ... 147 148

Commentaires sur ces manuels

Pas de commentaire